Monday, January 6th, 2020
INVITATION TO TENDER NOTICE
The Kenya Rural Roads Authority hereby invites sealed bids from KeRRA – Taita Taveta Region Interested Pre-qualified Roadworks Contractors and AGPO Eligible Firms/Groups, for maintenance of roadworks in Taveta, Wundanyi, Mwatate and Voi Constituencies; under 22% RMLF funds contracts, in the Financial Year 2019/2020 for the under listed roadworks projects.
|
TENDER NUMBER |
PROJECT NAME (Road No. and Name) & (Eligible Group)
|
SCOPE OF WORKS |
MANDATORY PRE-TENDER SITE VISIT: Date, venue and Time |
TENDER CLOSING/SUBMISSION DATES AND TIME |
TENDER DOCUMENT DOWNLOAD |
|
KeRRA/011/TTVT/39/002/2019-2020 |
D1094: A23A23 Rekeke – Lake Jipe Road (Pre-qualified Firms, Taveta Constituency, |
- Light Bush Clearing - Ditch/mitre drain/catch water drain excavation - Culvert Cleaning- fully blocked- 900mm - Culvert installation 900mm - Light Grading - Gravel Patching - HIV/AIDs campaigns - Soil erosion mitigation measures |
16th January, 2020, KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am. |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/003/2019-2020 |
E3059: D537Taveta - : Madarasani Road (AGPO - Youth) |
- Light Bush Clearing - Ditch/mitre drain/catch water drain excavation - Culvert Cleaning- fully blocked- 900mm - Culvert installation 900mm - Light Grading - Gravel Patching - HIV/AIDs campaigns |
16th January, 2020, KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/004/2019-2020 |
E3060: Eldoro - Kitobo Road (AGPO - Women) |
- Light Bush Clearing - Ditch works - Earthfill in ditches - Culvert Cleaning- fully blocked- 900mm - Culvert installation 900mm - Light Grading - Gravel Patching - HIV/AIDs campaigns |
16th January, 2020, KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/005/2019-2020 |
E3061: Taveta – Eldoro Road (Pre-qualified Firms, Taveta Constituency, |
- Light Bush Clearing - Ditch/mitre drain/catch water drain excavation - Culvert Cleaning- fully blocked- 900mm - Culvert installation 900mm - Light Grading - Gravel Patching - HIV/AIDs campaigns |
16th January, 2020, KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am. |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/006/2019-2020 |
E3062: Taveta - Nguutini Road (AGPO - Women) |
- Light Bush Clearing - Ditch/mitre drain/catch water drain excavation - Culvert Cleaning- fully blocked- 900mm - Culvert installation 900mm - Light Grading - Gravel Patching |
16th January, 2020, KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am. |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/007/2019-2020 |
E3063: Mboghoni - Timbila Road (AGPO - PWD) |
- Light Bush Clearing - Ditch/mitre drain/catch water drain excavation - Culvert Cleaning- fully blocked- 900mm - Culvert installation 900mm - Light Grading - Gravel Patching |
16th January, 2020, KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am. |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/008/2019-2020 |
C272: Mghaghamu – Sirienyi Road (Pre-qualified Firms – Wundanyi |
- Light Bush Clearing - Culvert Cleaning- fully blocked- 900mm - Light Grading - Gravel Patching - HIV/AIDs campaigns |
14th January, 2020, KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/009/2019-2020 |
C273: Kisimani – Kayanda Sec. School Road (AGPO – Youth) |
- Ditch/mitre drain/catch water drain excavation - Culvert Cleaning- fully blocked- 900mm - Light Grading - Gravel Patching - HIV/AIDs campaigns |
14th January, 2020, KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/010/2019-2020 |
D1100: Kungu - Wundanyi Road (AGPO – Women) |
- Light Bush Clearing - Culvert Cleaning- fully blocked- 900mm - Culvert installation 900mm - Light Grading - Gravel Patching |
14th January, 2020, KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/011/2019-2020 |
E3080: Mkamwasi - Ngerenyi Road (AGPO – Women) |
- Light Bush Clearing - Excavation & Spread in soft material & compact - Selected granular fill material - Culvert Cleaning- fully blocked- 900mm - Provide and place A142 fabric mesh reinforcement - Heavy grading without watering or compaction - Provide, lay and compact Hand packed stone material including fillings voids with stone dust - Provide place and compact concrete class 20/25 concrete |
14th January, 2020, KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/012/2019-2020 |
E3082: Kishushe - Makandenyi Road (Pre-qualified Firms – Wundanyi |
- Excavation & Spread in soft material & compact - Selected granular fill material - Culvert Cleaning- fully blocked- 900mm - Culvert installation – 900mm - Provide and place A142 fabric mesh reinforcement - Heavy grading without watering or compaction - Provide, lay and compact Hand packed stone material including fillings voids with stone dust - Provide place and compact concrete class 20/25 concrete - HIV/AIDs campaigns |
14th January, 2020, KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/013/2019-2020 |
E3082: Makandenyi - Ghazi Road (Pre-qualified Firms – Wundanyi |
- Light bush clearing - Excavation & Spread in soft material & compact - Selected granular fill material - Culvert installation – 900mm - Provide and place A142 fabric mesh reinforcement - Heavy grading without watering or compaction - Provide, lay and compact Hand packed stone material including fillings voids with stone dust - Provide place and compact concrete class 20/25 concrete - HIV/AIDs campaigns |
14th January, 2020, KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/014/2019-2020 |
F3018: Canon Kituri - Kungu Road Road (AGPO – PWD) |
- Light Bush Clearing - Culvert Cleaning- fully blocked- 900mm - Heavy grading without watering or compaction - Gravel Patching - HIV/AIDs campaigns |
14th January, 2020, KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/015/2019-2020 |
C272: Bura Station – Mghaghamu Road (Pre-qualified Firms – Mwatate |
- Light bush clearing - Excavation & Spread in soft material & compact - Selected granular fill material - Culvert Cleaning- fully blocked- 900mm - Culvert installation – 900mm - Provide and place A142 fabric mesh reinforcement - Heavy grading without watering or compaction - Provide, lay and compact Hand packed stone material including fillings voids with stone dust - Provide place and compact concrete class 20/25 concrete - HIV/AIDs campaigns |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/016/2019-2020 |
C272: Sirienyi - Shelemba Road (AGPO – PWD) |
- Light Bush Clearing - Culvert Cleaning- fully blocked- 900mm - Culvert installation – 900mm - Heavy grading without watering or compaction - HIV/AIDs campaigns |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/017/2019-2020 |
C273: Maktau - Kisimani Road (AGPO – Women/Youth) |
- Light Bush Clearing - Culvert Cleaning- fully blocked- 900mm - Culvert installation – 900mm - Light grading - Gravel patching - HIV/AIDs campaigns |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/018/2019-2020 |
C274: Fighinyi - Mwambirwa Road (Pre-qualified Firms – Mwatate |
- Light bush clearing - Excavation & Spread in soft material & compact - Selected granular fill material - Provide and place A142 fabric mesh reinforcement - Heavy grading without watering or compaction - Provide, lay and compact Hand packed stone material including fillings voids with stone dust - Provide place and compact concrete class 20/25 concrete |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/019/2019-2020 |
D1098: Msau - Kighombo Road (AGPO – Youth) |
- Light Bush Clearing - Culvert Cleaning- fully blocked- 900mm - Culvert installation – 900mm - Heavy grading without watering or compaction - HIV/AIDs campaigns |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/020/2019-2020 |
D1100: A23Mwatate – Wusi Junc Road (Pre-qualified Firms – Mwatate |
- Light bush clearing - Excavation & Spread in soft material & compact - Selected granular fill material - Culvert Cleaning- fully blocked- 900mm - Provide and place A142 fabric mesh reinforcement - Heavy grading without watering or compaction - Provide, lay and compact Hand packed stone material including fillings voids with stone dust - Provide place and compact concrete class 20/25 concrete - HIV/AIDs campaigns |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/021/2019-2020 |
D1100: Kungu - Dembwa Road (AGPO – Women) |
- Light Bush Clearing - Heavy grading without watering or compaction - Gravel Patching - HIV/AIDs campaigns |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/022/2019-2020 |
D1101: C104Mwatate – Mwatunge Road (Pre-qualified Firms – Mwatate – |
- Light Bush Clearing - Light Grading - Gravel Patching |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/023/2019-2020 |
E3080: Maktau – Mkamwasi (AGPO – Youth) |
- Light Bush Clearing - Light Grading - Gravel Patching |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/024/2019-2020 |
F3019: Bura Mission – Mghange Dawida Road (AGPO – Women/ Youth) |
- Light Bush Clearing - Heavy grading without watering or compaction - Gravel Patching - HIV/AIDs campaigns |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/025/2019-2020 |
C206: Rukanga - Mackinon Road (AGPO – Women) |
- Light grading |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/026/2019-2020 |
C273: Kayanda Sec. School – Ndii Road (AGPO – PWD) |
- Light Bush Clearing - Light Grading |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/027/2017-2018 |
C274: Mwambirwa - Ndii Road (Pre-qualified Firms – Voi – |
- Light Bush Clearing - Ditch/mitre drain/catch water drain excavation - Culvert Cleaning- fully blocked- 900mm - Heavy grading without watering or compaction - HIV/AIDs campaigns |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/028/2019-2020 |
C275: Rukanga – Maungu Road (AGPO – Women/Youth) |
- Light Bush Clearing - Culvert Cleaning- fully blocked- 900mm - Light grading |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/029/2019-2020 |
D1098: Kighombo - Konenyi Road (AGPO – Youth) |
- Light Bush Clearing - Culvert Cleaning- fully blocked- 900mm - Light grading - Gravel patching |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/030/2019-2020 |
E3074: Voi – Mwalangi Road (Pre-qualified Firms – Voi ) |
- Light bush clearing - Excavation & Spread in soft material & compact - Selected granular fill material - Culvert Cleaning- fully blocked- 900mm - Provide and place A142 fabric mesh reinforcement - Light grading - Provide, lay and compact Hand packed stone material including fillings voids with stone dust - Provide place and compact concrete class 20/25 concrete |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/031/2019-2020 |
E3075: Kanyanga - Mwalangi Road (AGPO – Youth) |
- Heavy grading without watering or compaction |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/032/2019-2020 |
E3076: Kajire - Gimba Road (AGPO – PWD) |
- Culvert Cleaning- fully blocked- 900mm - Light grading |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/033/2019-2020 |
E3076: Ndara - Kajire Road (AGPO – PWD) |
- Light Bush Clearing - Culvert Cleaning- fully blocked- 900mm - Light grading |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/034/2019-2020 |
E3083: Wongonyi - Konenyi Road (Pre-qualified Firms – Voi ) |
- Light bush clearing - Excavation & Spread in soft material & compact - Selected granular fill material - Culvert Cleaning- fully blocked- 900mm - Provide and place A142 fabric mesh reinforcement - Heavy grading without watering or compaction - Provide, lay and compact Hand packed stone material including fillings voids with stone dust - Provide place and compact concrete class 20/25 concrete |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/035/2019-2020 |
F3017: Kitenge - Bungule Road (AGPO – Women) |
- Ditch works – Earth fill in ditches - Culvert installation 900mm - Light grading |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
|
KeRRA/011/TTVT/39/036/2019-2020 |
G3822: Tausa - Irima Road (AGPO – Youth) |
- Light Bush Clearing - Light Grading - Gravel patching |
15th January, 2020 KeRRA Voi Regional Offices, in Voi Town, at 9:00 am |
23nd January, 2020 at 11:00 am |
DOWNLOAD |
INSTRUCTIONS TO TENDERERS
- Pre-tender site visits are MANDATORY – please note the site visit dates above. The cost of visiting the site shall be at the bidder’s own expense.
- Bidders are to attach copies of the mandatory requirements i.e. Certified copies of Certificate of incorporation, National Construction Authority Certificate category 5,6,7,8. PIN registration certificate with VAT registration obligations, copy of valid tax compliance certificate and other document specified in the tender document.
- For the Tenders under special group the bidders must be registered under the public and disposal act (preference and reservations) regulations, 2013 and provide documents from treasury to prove that they belong to any of the above category.
- Bidders may be required to provide the original mandatory documents before the award.
- In addition, the Binders shall provide all information and documents required by the Employer in bid document.
Interested contractors who meet the above criteria may obtain the tender documents from KeRRA website www.kerra.go.ke for free of charge from January, 7th, 2020. Tenders sealed in separate envelopes to be addressed to: -
DEPUTY DIRECTOR
KENYA RURAL ROADS AUTHORITY,
P.O. BOX 131 – 80300
VOI, KENYA
And deposited in the tender box at the reception, so as to be received not later than 11.00 A.M or before JANUARY, 23, 2020. Tender opening will take place immediately after closing time in the presence of Bidders who wish to attend. The Authority reserves the right to accept or reject the tender without giving reasons and is not bound to accept the lowest or any tender.
Senior Supply Chain Officer,
For Deputy Director, KeRRA-Taita Taveta Region
