22nd January 2019
KENYA RURAL ROADS AUTHORITY
KIAMBU REGION
Download TENDER NOTICE here! Tender Notice
The Kenya Rural Roads Authority (KeRRA) is a state corporation established under the Kenya Roads Act 2007 with the responsibility for management, development, rehabilitation and maintenance of rural roads.
The Authority, Kiambu Region hereby invites bids from eligible construction Companies to bid for Routine Maintenance Works on Various Roads in the Constituencies listed below for the Financial Year 2018/2019.
Eligible bidders must be prequalified in category C, of the constituencies they wish to bid. (Bidders for projects under Youth, Women and PWD need no prior prequalification in the Constituencies)
Bidders are requested to download full details of tender documents from Authorities Website. (www.kerra.go.ke/) / (http://www.kerra.go.ke) with effect from Thursday 24th January, 2019.
Pre-bid sites visits will be open BUT MADATORY and bidders are free to visit the sites with prior arrangements with Constituency Roads Officers (CROs) of various Constituencies where the projects are located during normal working days before the close of the tender. Bidders must ensure The Site Visit Certificate is signed by the respective Constituency Roads Officer (CRO).
Eligible bidders must meet/attach the following requirements among others.
1.1 Signed/stamped tender forms and completeness of tender document
2.2 Properly filled anti-corruption pledge form.
3.3 Properly filled confidential business questionnaire
4.4 Certified Copy of Certificate of Incorporation
5.5 Certified copy of Certificate of Registration with the National Construction Authority (NCA 4,5,6,7&8)
6.6 A copy of a Valid Tax Compliance Certificate (Will be verified on KRA TCC Checker)
7.7 VAT Registration/PIN Registrations
8.8 Authority to seek reference from the Tenderer’s bankers
9.9 Current Litigation Information
10.10 Certified Copy of RECENT (12 Months before opening date) CR12 form from the Registrar of Companies and certified copies of ID’s of the directors.
11.11 Proof of a Bank Account operated by the Bidder (provide latest six (6) months bank statement)
12.12 Bidders SHALL sequentially serialize all pages for each tender document submitted.
13.13 Only prequalified contractors from the respective constituencies are entitled to bid. (Bidders for projects under Youth, Women and PWD need no prior prequalification in the Constituencies)
14.14 Certified copy of a valid certificate of registration with AGPO (Small Works/Engineering) issued by the National Treasury or the respective County Treasury in the relevant category (Youth, Women & PWD) for works with special groups.
Note:
- Certification of documents shall be original and executed by a commissioner for oaths.
- No bidder shall be awarded more than one tender as advertised in this notice.
Bidders shall include all the documents and information as described in the instructions to tenderers. Responsive bids will be determined through evaluation criteria as set out in the instruction to bidders and the Tender Notice.
Interested eligible bidders may obtain further information from the office of the Regional Manager, KeRRA Kiambu Offices in Kiambu during normal working hours.
Completed tender documents are to be enclosed in plain sealed envelopes marked with Tender Name and reference number and deposited in the respective constituencies tender boxes situated at the Kenya Rural Roads Authority Regional Offices in Kiambu and be addressed to:
The Regional Director,
Kenya Rural Roads Authority,
Kiambu Region
P.O Box 700-00900
Kiambu
So as to be received on or before Tuesday 12th February 2019 at 11.00 am.
Opening of bids shall commence at 11.15 am in the presence of Tenderers/ Representatives who choose to attend.
Eng. Joseph Mbugua
Deputy Director
Kiambu Region
|
KIAMBU REGION 22% FY:2018/2019 ADVERT |
|
|||||||
|
S/NO. |
Road No. |
Road Name |
Contract No. |
Constituency |
Eligibility |
Download |
||
|
1 |
G21718 |
Pcea Nachu-Marengeta |
KeRRA/11/KBU/39/22%/2-27-18/19-005 |
KIKUYU |
PREQUALIFIED |
Download | ||
|
2 |
G21523 |
Jct D411 Wagakari-Njumbi Pri Sch |
KeRRA/11/KBU/39/22%/2-27-18/19-006 |
KIKUYU |
PREQUALIFIED |
|
||
|
3 |
G21509 |
Kaarie-Riu Nderi |
KeRRA/11/KBU/39/22%/2-27-18/19-007 |
KIKUYU |
PREQUALIFIED |
|
||
|
4 |
G21379/372 |
Gaitumbi Water Project-Genesis |
KeRRA/11/KBU/39/22%/2-27-18/19-008 |
KIKUYU |
PREQUALIFIED |
|
||
|
5 |
G21646 |
Green Garden-Kidfarmaco |
KeRRA/11/KBU/39/22%/2-27-18/19-009 |
KIKUYU |
YOUTH |
|
||
|
6 |
G21430 |
Ndome-Orange Park |
KeRRA/11/KBU/39/22%/2-27-18/19-010 |
KIKUYU |
WOMEN |
|
||
|
7 |
F2009 |
Mbomboini-Ndiguini |
KeRRA/11/KBU/39/22%/2-27-18/19-011 |
KIKUYU |
PWD |
|
||
|
8 |
C556 |
Juja -Juja Farm - Ndarugo |
KeRRA/11/KBU/39/22%/2-27-18/19-012 |
JUJA |
PREQUALIFIED |
|
||
|
9 |
C556 |
Chai Estate-Jujafarm |
KeRRA/11/KBU/39/22%/2-27-18/19-013 |
JUJA |
PREQUALIFIED |
|
||
|
10 |
P76/91 |
Kumura Primary - Matangi |
KeRRA/11/KBU/39/22%/2-27-18/19-014 |
JUJA |
PWD |
|
||
|
11 |
P305 |
Junc.Courtesy Beach Toll Primary |
KeRRA/11/KBU/39/22%/2-27-18/19-015 |
JUJA |
PREQUALIFIED |
|
||
|
12 |
P76/91 |
Ha- Kairu-Thome-Kumura Primary |
KeRRA/11/KBU/39/22%/2-27-18/19-016 |
JUJA |
WOMEN |
|
||
|
13 |
G299903 |
Kipipiri - Footbridge (A2) |
KeRRA/11/KBU/39/22%/2-27-18/19-017 |
JUJA |
YOUTH |
|
||
|
14 |
C556 |
Juja Farm -Kwa murage |
KeRRA/11/KBU/39/22%/2-27-18/19-018 |
JUJA |
PREQUALIFIED |
|
||
|
15 |
D1431 |
Marige - Watathi |
KeRRA/11/KBU/39/22%/2-27-18/19-019 |
GATUNDU NORTH |
PREQUALIFIED |
|
||
|
16 |
D1431 |
Ha Gathirwa - Makohokoho |
KeRRA/11/KBU/39/22%/2-27-18/19-020 |
GATUNDU NORTH |
PWD |
|
||
|
17 |
G29655 |
Mukurwe - Gatina |
KeRRA/11/KBU/39/22%/2-27-18/19-021 |
GATUNDU NORTH |
PREQUALIFIED |
|
||
|
18 |
D1431 |
Watathi - Ihiga-Ini |
KeRRA/11/KBU/39/22%/2-27-18/19-022 |
GATUNDU NORTH |
WOMEN |
|
||
|
19 |
D1431 |
Ihiga-Ini - Gathaite |
KeRRA/11/KBU/39/22%/2-27-18/19-023 |
GATUNDU NORTH |
YOUTH |
|
||
|
20 |
D1431 |
Gathaite - Ha Gathiriwa |
KeRRA/11/KBU/39/22%/2-27-18/19-024 |
GATUNDU NORTH |
PREQUALIFIED |
|
||
|
21 |
L16 |
Jolem Plaza - Kimunye |
KeRRA/11/KBU/39/22%/2-27-18/19-025 |
THIKA |
PREQUALIFIED |
|
||
|
22 |
L16 |
Kimunye - Ha Kinyua |
KeRRA/11/KBU/39/22%/2-27-18/19-026 |
THIKA |
PWD |
|
||
|
23 |
URF 50: |
Ha Dominic- Ha Gachuki |
KeRRA/11/KBU/39/22%/2-27-18/19-027 |
THIKA |
WOMEN |
|
||
|
24 |
URA 68: |
Ngirigacha - Ha Kimani |
KeRRA/11/KBU/39/22%/2-27-18/19-028 |
THIKA |
YOUTH |
|
||
|
25 |
URA 68 |
Ha Kimani - Ha John |
KeRRA/11/KBU/39/22%/2-27-18/19-029 |
THIKA |
PREQUALIFIED |
|
||
|
26 |
G29484 |
Kagumoini-Jn D379 Wamuguma |
KeRRA/11/KBU/39/22%/2-27-18/19-030 |
GATUNDU SOUTH |
PREQUALIFIED |
|
||
|
27 |
G29375 |
Jn D379 Karia Mburi-Kahugu River |
KeRRA/11/KBU/39/22%/2-27-18/19-031 |
GATUNDU SOUTH |
PREQUALIFIED |
|
||
|
28 |
G29216 |
Jn E496-Jn E499 Nduchi |
KeRRA/11/KBU/39/22%/2-27-18/19-032 |
GATUNDU SOUTH |
PREQUALIFIED |
|
||
|
29 |
G29522 |
Jn E502 Thegi-Jn C64 Chau |
KeRRA/11/KBU/39/22%/2-27-18/19-033 |
GATUNDU SOUTH |
PWD |
|
||
|
30 |
URA 67 |
Jn U_29488 Kagumoini Pri-Gitiri River |
KeRRA/11/KBU/39/22%/2-27-18/19-034/035 |
GATUNDU SOUTH |
PREQUALIFIED |
|
||
|
G29384 |
Jn U_29383-Gacuha |
|
||||||
|
31 |
G29390 |
Jn E496 Ihura-Githembe |
KeRRA/11/KBU/39/22%/2-27-18/19-036 |
GATUNDU SOUTH |
PREQUALIFIED |
|
||
|
32 |
G29323 |
Nyamuna-Ngaragaca |
KeRRA/11/KBU/39/22%/2-27-18/19-037 |
GATUNDU SOUTH |
PREQUALIFIED |
|
||
|
33 |
G29323 |
Nagara - Kibiru |
KeRRA/11/KBU/39/22%/2-27-18/19-038 |
GATUNDU SOUTH |
YOUTH |
|
||
|
34 |
G29520 |
Jn U_29512-Kagera Primary School |
KeRRA/11/KBU/39/22%/2-27-18/19-039 |
GATUNDU SOUTH |
WOMEN |
Download | ||
|
35 |
P196 Limuru |
Jct E430 Karengeti Adolf |
KeRRA/11/KBU/39/22%/2-27-18/19-040 |
LIMURU |
PREQUALIFIED |
|
||
|
36 |
D1458 |
St Peters Catholic -Mithiga Sec -Pcea Mithiga Church |
KeRRA/11/KBU/39/22%/2-27-18/19-041 |
LIMURU |
PREQUALIFIED |
|
||
|
37 |
D1458 |
Pcea Mithiga- Ack Bishop Ranji Boys |
KeRRA/11/KBU/39/22%/2-27-18/19-042 |
LIMURU |
PREQUALIFIED |
|
||
|
38 |
D1458 |
Ack Bishop Ranji Boys -Kangau |
KeRRA/11/KBU/39/22%/2-27-18/19-043 |
LIMURU |
PWD |
|
||
|
39 |
D1458 |
Kangau-Dairy Collection Hamuya |
KeRRA/11/KBU/39/22%/2-27-18/19-044 |
LIMURU |
PREQUALIFIED |
|
||
|
40 |
P169 Limuru |
Jct A104 Njira Ya Gicagi-Kamirithu Polytechnic |
KeRRA/11/KBU/39/22%/2-27-18/19-045 |
LIMURU |
WOMEN |
|
||
|
41 |
P169 Limuru |
Kamirithu Polytechnic -Jct E430 Catholic |
KeRRA/11/KBU/39/22%/2-27-18/19-046 |
LIMURU |
YOUTH |
|
||
|
42 |
G2490 |
Gathanji - Ikuria - Karia |
KeRRA/11/KBU/39/22%/2-27-18/19-047 |
GITHUNGURI |
PREQUALIFIED |
|
||
|
43 |
E2028 |
Miguta (Ha Ndonga) - Bara Inya |
KeRRA/11/KBU/39/22%/2-27-18/19-048 |
GITHUNGURI |
PWD |
|
||
|
44 |
E2028 |
Bara Inya) - Riagithu Jct B30 |
KeRRA/11/KBU/39/22%/2-27-18/19-049 |
GITHUNGURI |
PREQUALIFIED |
|
||
|
45 |
URP 80 |
Jct C560 Kangengu - Ndathi-Ini |
KeRRA/11/KBU/39/22%/2-27-18/19-050 |
GITHUNGURI |
PREQUALIFIED |
|
||
|
46 |
URP 80 |
Ndathi-Ini - Polytechnic Jct |
KeRRA/11/KBU/39/22%/2-27-18/19-051 |
GITHUNGURI |
YOUTH |
|
||
|
47 |
URP 80 |
Polytechnic Jct - Kambui |
KeRRA/11/KBU/39/22%/2-27-18/19-052 |
GITHUNGURI |
WOMEN |
|
||
|
48 |
C557 |
Kinale - Gatamaiyu |
KeRRA/11/KBU/39/22%/2-27-18/19-053 |
LARI |
PREQUALIFIED |
|
||
|
49 |
G2017 |
Karinga - Kwa Edward |
KeRRA/11/KBU/39/22%/2-27-18/19-054 |
LARI |
PREQUALIFIED |
|
||
|
50 |
G22721 |
Bathi - Kimende |
KeRRA/11/KBU/39/22%/2-27-18/19-055 |
LARI |
PREQUALIFIED |
|
||
|
51 |
D1428 |
Gatamaiyu River - Hato |
KeRRA/11/KBU/39/22%/2-27-18/19-056 |
LARI |
PWD |
|
||
|
52 |
D1428 |
Hato - Kwa Edward |
KeRRA/11/KBU/39/22%/2-27-18/19-057 |
LARI |
YOUTH |
|
||
|
53 |
C558 |
Matathia - Escarpment |
KeRRA/11/KBU/39/22%/2-27-18/19-058 |
LARI |
WOMEN |
|
||
|
54 |
D1459 |
Gachie - Gacharage |
KeRRA/11/KBU/39/22%/2-27-18/19-059 |
KIAMBAA |
PREQUALIFIED |
|
||
|
55 |
G21029 |
Kihara loop |
KeRRA/11/KBU/39/22%/2-27-18/19-060 |
KIAMBAA |
PREQUALIFIED |
|
||
|
56 |
G2997 |
Karura - KPLC |
KeRRA/11/KBU/39/22%/2-27-18/19-061 |
KIAMBAA |
PREQUALIFIED |
|
||
|
57 |
G2995 |
Waphat - Kairia |
KeRRA/11/KBU/39/22%/2-27-18/19-062 |
KIAMBAA |
PREQUALIFIED |
|
||
|
58 |
G2649 |
Muongoiya-Muchatha |
KeRRA/11/KBU/39/22%/2-27-18/19-063 |
KIAMBAA |
PWD |
|
||
|
59 |
G2626 |
Waguthu - Mayuyu |
KeRRA/11/KBU/39/22%/2-27-18/19-064 |
KIAMBAA |
WOMEN |
|
||
|
60 |
E2043 |
Karura - Kagongo |
KeRRA/11/KBU/39/22%/2-27-18/19-065 |
KIAMBAA |
YOUTH |
|
||
|
61 |
G2649 |
Access to Muongoiya Sec Sch. |
KeRRA/11/KBU/39/22%/2-27-18/19-066 |
KIAMBAA |
PREQUALIFIED |
|
||
|
62 |
P338 |
Makiu - Riara Road |
KeRRA/11/KBU/39/22%/2-27-18/19-068 |
KIAMBU |
PWD |
|
||
|
63 |
P175 |
Ha Kametu - Karunga - Mburiria - County Offices |
KeRRA/11/KBU/39/22%/2-27-18/19-069 |
KIAMBU |
PREQUALIFIED |
|
||
|
64 |
D1457 |
Jn C558 Ndmberi - Gichocho |
KeRRA/11/KBU/39/22%/2-27-18/19-070 |
KIAMBU |
PREQUALIFIED |
|
||
|
65 |
D1457 |
Gichocho - Jn B30 Riabai |
KeRRA/11/KBU/39/22%/2-27-18/19-071 |
KIAMBU |
WOMEN |
|
||
|
66 |
P131 |
JN Kariuki - Njunu |
KeRRA/11/KBU/39/22%/2-27-18/19-072 |
KIAMBU |
PREQUALIFIED |
|
||
|
67 |
P228/257 |
Riabai Shopping Centre - Jn Ndungu Kirabi |
KeRRA/11/KBU/39/22%/2-27-18/19-073 |
KIAMBU |
YOUTH |
|
||
|
68 |
P130 |
Kiratina - Gikumari Road |
KeRRA/11/KBU/39/22%/2-27-18/19-074 |
RUIRU |
PREQUALIFIED |
|
||
|
69 |
P144 |
St. Silas - Mwihoko Sec. School |
KeRRA/11/KBU/39/22%/2-27-18/19-075 |
RUIRU |
PWD |
|
||
|
70 |
P155/164 |
Progressive - Moonlight - Manguo |
KeRRA/11/KBU/39/22%/2-27-18/19-076 |
RUIRU |
PREQUALIFIED |
|
||
|
71 |
N301 |
Sweet Plaza - Blessed Banner - Mt. Kenya |
KeRRA/11/KBU/39/22%/2-27-18/19-077 |
RUIRU |
PREQUALIFIED |
|
||
|
72 |
N573 |
Wataalam - Maruti Stage |
KeRRA/11/KBU/39/22%/2-27-18/19-078 |
RUIRU |
WOMEN |
|
||
|
73 |
URP 46 |
Membley - Jacridge School - Eastern Bypass |
KeRRA/11/KBU/39/22%/2-27-18/19-079 |
RUIRU |
YOUTH |
|
||
|
74 |
G21228 /36/18/5 |
Gachio - Maraaro - Riverside |
KeRRA/11/KBU/39/22%/2-27-18/19-081 |
KABETE |
PREQUALIFIED |
|
||
|
75 |
G21216 |
Kiawanugu Road |
KeRRA/11/KBU/39/22%/2-27-18/19-082 |
KABETE |
PREQUALIFIED |
|
||
|
76 |
G21957/6 |
Gatuanabu Road |
KeRRA/11/KBU/39/22%/2-27-18/19-083 |
KABETE |
YOUTH |
|
||
|
77 |
G21956 |
Kang'eng'u - Githithima |
KeRRA/11/KBU/39/22%/2-27-18/19-084 |
KABETE |
WOMEN |
|
||
|
78 |
G21331 |
Maina Road |
KeRRA/11/KBU/39/22%/2-27-18/19-085 |
KABETE |
PREQUALIFIED |
|
||
|
79 |
G21328 |
Gathang'I Road |
KeRRA/11/KBU/39/22%/2-27-18/19-086 |
KABETE |
PWD |
|
||
|
KIAMBU REGION 10% RMLF FY: 2018/2019 |
||||||
|
S/NO. |
Road No. |
Road Name |
Contract No. |
Constituency |
Eligibility |
Downloads |
|
1 |
C559 |
Karura - Ndenderu Karuri |
KeRRA/11/KBU/39/10%/2-27-18/19-087 |
KIAMBAA |
PREQUALIFIED |
|
|
2 |
C559 |
Kanunga - Senior Chief School |
KeRRA/11/KBU/39/10%/2-27-18/19-088 |
KIAMBAA |
WOMEN |
|
|
3 |
E2032 |
Kaiyaba - Four Roads |
KeRRA/11/KBU/39/10%/2-27-18/19-089 |
KIAMBAA |
YOUTH |
|
|
4 |
E2032 |
Four Roads - Muchatha |
KeRRA/11/KBU/39/10%/2-27-18/19-119 |
KIAMBAA |
PWD |
|
|
5 |
D1436(E440) |
Kwaregi TTI - Kagaa |
KeRRA/11/KBU/39/10%/2-27-18/19-092 |
LARI |
PREQUALIFIED |
|
|
6 |
D1433(E439) |
Ruiru River - Kamburu |
KeRRA/11/KBU/39/10%/2-27-18/19-091 |
LARI |
PWD |
|
|
7 |
G21146 |
Marugu B Road |
KeRRA/11/KBU/39/10%/2-27-18/19-093 |
KABETE |
YOUTH |
|
|
8 |
G21299/306 |
Wa Jimmy Driving - Uthiru Pri |
KeRRA/11/KBU/39/10%/2-27-18/19-094 |
KABETE |
PWD |
|
|
9 |
G21330/29 |
Kabui Road |
KeRRA/11/KBU/39/10%/2-27-18/19-095 |
KABETE |
PREQUALIFIED |
|
|
10 |
URP 12 |
Kanunga Primary School & Compound |
KeRRA/11/KBU/39/10%/2-27-18/19-097 |
KIAMBU |
PREQUALIFIED |
|
|
11 |
C559 |
Red Nova - Kanunga |
KeRRA/11/KBU/39/10%/2-27-18/19-098 |
KIAMBU |
PWD |
|
|
12 |
UAA 4 |
Legacy House - White House |
KeRRA/11/KBU/39/10%/2-27-18/19-100 |
RUIRU |
PREQUALIFIED |
|
|
13 |
P21/22 |
Gatongora - Vision Park Estate - Kwa Vice |
KeRRA/11/KBU/39/10%/2-27-18/19-101 |
RUIRU |
YOUTH |
|
|
14 |
C559 |
Kamiti River - Ruiru Town |
KeRRA/11/KBU/39/10%/2-27-18/19-099 |
RUIRU |
PREQUALIFIED |
|
|
15 |
F2043 |
Kamakwa(Jnc E 1529 - Maguna(Jnc E1529) |
KeRRA/11/KBU/39/10%/2-27-18/19-103 |
GITHUNGURI |
WOMEN |
|
|
16 |
G 2549 |
Karia - Lioki Secondary School |
KeRRA/11/KBU/39/10%/2-27-18/19-104 |
GITHUNGURI |
PREQUALIFIED |
|
|
17 |
G2291 |
Ngewa - Raiyani(Ha Kahuria) |
KeRRA/11/KBU/39/10%/2-27-18/19-105 |
GITHUNGURI |
PREQUALIFIED |
|
|
18 |
C556 |
Gatuanyaga - Ngurai |
KeRRA/11/KBU/39/10%/2-27-18/19-106 |
THIKA TOWN |
WOMEN |
|
|
19 |
C556 |
Ngurai - Githima |
KeRRA/11/KBU/39/10%/2-27-18/19-107 |
THIKA TOWN |
PREQUALIFIED |
|
|
20 |
D1434 |
Mangu - Karakuta |
KeRRA/11/KBU/39/10%/2-27-18/19-108 |
GATUNDU NORTH |
WOMEN |
|
|
21 |
G29371/72: |
Ngorongo - Dc'S Office |
KeRRA/11/KBU/39/10%/2-27-18/19-109 |
GATUNDU NORTH |
PREQUALIFIED |
|
|
22 |
G29653: |
Gatina - Jk Shop |
KeRRA/11/KBU/39/10%/2-27-18/19-110 |
GATUNDU NORTH |
YOUTH |
|
|
23 |
P290Ruiru |
Mugutha( AP)-Secondary Mugutha pry. |
KeRRA/11/KBU/39/10%/2-27-18/19-111 |
JUJA |
PREQUALIFIED |
|
|
24 |
P290Ruiru |
Mugutha pry. - sinai Estate |
KeRRA/11/KBU/39/10%/2-27-18/19-112 |
JUJA |
YOUTH |
|
|
25 |
G29738 |
Juc.E495 - Midas-Tora |
KeRRA/11/KBU/39/10%/2-27-18/19-113 |
JUJA |
PREQUALIFIED |
|
|
26 |
G21570/568/581 |
Gikambura Shopping Centre-Kwa Mwalimu Thomas |
KeRRA/11/KBU/39/10%/2-27-18/19-114 |
KIKUYU |
PREQUALIFIED |
|
|
27 |
G22134 |
Kerwa-Kirimiti Road |
KeRRA/11/KBU/39/10%/2-27-18/19-115 |
KIKUYU |
WOMEN |
|
|
28 |
G29220 |
Jn D398-Kabuteti |
KeRRA/11/KBU/39/10%/2-27-18/19-116 |
GATUNDU SOUTH |
PREQUALIFIED |
|
|
29 |
URP50 GS |
Jn D397 Mutomo-Thangari-Gachoka Sec Sch |
KeRRA/11/KBU/39/10%/2-27-18/19-117 |
GATUNDU SOUTH |
WOMEN |
|
|
30 |
G22409 |
Jct D411 Kabucho-E415 Pcea Ismael Kagunyi |
KeRRA/11/KBU/39/10%/2-27-18/19-118 |
LIMURU |
PREQUALIFIED |
|