ADDENDUM NO.1 - Download Here
TENDER NOTICE - Download here!
|
KITUI RURAL CONSTITUENCY 10% RMLF ALLOCATION |
||||||||
|
081 |
E709 JCN D511:Kalulini- Kanyangi |
AGPO |
3,200,000.00 |
Gravel Patching |
Download |
3/7/2018 (Depart from Kitui Regional Office at 10.00AM) |
||
|
KITUI SOUTH CONSTITUENCY 10% RMLF ALLOCATION |
||||||||
|
079 |
R15-Kitui:Katilini - Athi |
OPEN |
4,280,000.00 |
Excavation in hard and soft material, Rock fill to Swamp, Concrete Works and Drift Construction. |
Document |
29/6/2018 (Depart from Kitui Regional Office at 10.00AM) |
||
|
KITUI EAST CONSTITUENCY 10% RMLF ALLOCATION |
||||||||
|
082 |
D509: Ikoo Bridge- Mutitu - Zombe |
OPEN |
4,090,000.00 |
Concrete works , Drift construction and Gravel Patching |
Download |
3/7/2018 (Depart from Kitui Regional Office at 10.00AM) |
||
|
KITUI WEST CONSTITUENCY 10% RMLF ALLOCATION |
||||||||
|
078 |
E744J2:Usiani -Yalatani |
AGPO |
3,190,000.00 |
Concrete works |
Download |
2/7/2018 (Depart from Kitui Regional Office at 10.00AM) |
||
|
KITUI CENTRAL CONSTITUENCY 10% RMLF ALLOCATION |
||||||||
|
080 |
D507:B7 Kitui Town – Museve - Mikuyuni |
OPEN |
5,810,000.00 |
Culvert Cleaning, Concrete works |
Download |
2/7/2018 (Depart from Kitui Regional Office at 10.00AM) |
||
|
KITUI CENTRAL CONSTITUENCY 22% RMLF ALLOCATION |
||||||||
|
035 |
E744J2:Usiani -Kasyala |
OPEN |
4,800,000.00 |
Light bush clearing, concrete works, light grading |
Download |
2/7/2018 (Depart from Kitui Regional Office at 10.00AM) |
||
|
MWINGI CENTRAL CONSTITUENCY 10% RMLF ALLOCATION |
||||||||
|
083 |
R34:Nguni - Masavi |
OPEN |
4,300,000.00 |
Cut to fill in soft material, culvert cleaning and installation, Drift construction Concrete works, Gabion Installation, Rock Fill to Gabions, Heavy Grading and Gravel Patching. |
Download |
4/7/2018 (Depart from mwingi Office at 10.00AM) |
||
|
MWINGI NORTH CONSTITUENCY 10% RMLF ALLOCATION |
||||||||
|
076 |
R3-01:Ngiluni - Ngomeni |
OPEN |
4,300,000.00 |
Excavation for structure, rock fill to structure, concrete works, Gabion Installation, rock fill to gabions, and Drift |
Download |
5/7/2018 (Depart from mwingi Office at 10.00AM) |
||
|
MWINGI WEST CONSTITUENCY 10% RMLF ALLOCATION |
||||||||
|
029 |
E731:Mwanzilu –Ikoo- Kamandio |
AGPO |
3,920,000.00 |
Light Bush Clearing, Culvert Cleaning, Culvert installation, Concrete works, Light Grading, Drift Construction. |
Download |
4/7/2018 (Depart from mwingi Office at 10.00AM) |
||