Tel: +254 711 851103
 
 
Language:

Google Translate Widget by Infofru

Author Site Reviewresults

Wednesday, 04 February 2026

26 th February, 2018

TENDER NOTICE (22%rmlf), 2017-2018: ADDENDUM No.2

Reference is made to the Tender Advert 22% RMLF allocation for road works for Financial Year 2017/2018 dated Monday, 12th February, 2018 We wish to notify all interested contractors who participated in the pre-tender site visits that the tender closing date has been postponed from Thursday, 1 st March, 2018 to Monday, 5 th March, 2018.
Opening of the Bids shall commence at 10.00 am in the presence of Bidders/Representatives who wish to be present All other conditions remain the same We sincerely apologize for any inconvenience caused

Eng.M.Koech
Regional Manager

Road Code

Road Name

Constituency

Tender No.

Road workCategory

 Work Plan Cost (incl. VAT)

Pre-Bid site  visit Date

Eligibility

Downloads

U-G712791

Kipsirichet-E1100 Chesiliet-Kimout

Kipkelion East

KeRRA/011/KCO/39/22%CRC/008/2017-2018

D

1,066,167.60

19.02.2018

General

addendum 1
addendum 2

Download

E1099

D312 Kaptenet-Kichawir

Kipkelion East

KeRRA/011/KCO/39/22%CRC/009/2017-2018

D

1,998,216.00

19.02.2018

Women

addendum 1
addendum 2

Download 

E1106

B1 Kapkawa-DB Kericho east

Sigowet/Soin

KeRRA/011/KCO/39/22%CRC/010/2017-2018

D

2,500,125.73

21.02.2018

Youth

Download

addendum 1
addendum 2

E 200

Chemosot-Chepkwarkwaran

Bureti

KeRRA/011/KCO/39/22%CRC/011/2017-2018

D

1,165,582.50

22.02.2018

General

addendum 1
addendum 2

Download

R13-Kericho

Kimorogo-E1107 Sosiot

Belgut

KeRRA/011/KCO/39/22%CRC/012/2017-2018

D

1,807,991.54

22.02.2018

Women

addendum 1
addendum 2

Download
BoQ

R9-Kericho

C23 Seretut-D228Chepkutbei

Belgut

KeRRA/011/KCO/39/22%CRC/013/2017-2018

D

1,496,086.80

22.02.2018

Youth

addendum 1
addendum 2

Download

U-G712783

C35 Kenyelet-D314 Tuiyobei

Kipkelion West

KeRRA/011/KCO/39/22%CRC/014/2017-2018

D

854,108.00

20.02.2018

General

addendum 1
addendum 2

Download

R11A- Kericho

C25 Kiptere-CB Belgut

Soin/Sigowet

KeRRA/011/KCO/39/22%CRC/015/2017-2018

C

1,399,772.00

21.02.2018

Women

addendum 1
addendum 2

Download

T2301-Kericho

D 229 Kericho-E222 Keongo

Ainamoi

KeRRA/011/KCO/39/22%CRC/016/2017-2018

C

5,483,969.60

21.02.2018

General

addendum 1
addendum 2

Download

E224 Keongo-Septet Ainamoi KeRRA/011/KCO/39/22%CRC/017/2017-2018 C 2,312,924.00 21.02.2018 PDW’S

addendum 1
addendum 2

Download

U-G712571 Niniie-Njerian Ainamoi KeRRA/011/KCO/39/22%CRC/018/2017-2018 C 3,190,348.00 21.02.2018 General

addendum 1
addendum 2

Download

E1096 D312 Kapsaos- D229 Ainamoi Ainamoi KeRRA/011/KCO/39/22%CRC/019/2017-2018 C 3,004,400.00 21.02.2018 Women

addendum 1
addendum 2

Download

E1106 DB Kericho west-B1 Sitotwet Ainamoi KeRRA/011/KCO/39/22%CRC/020/2017-2018 C 3,304,840.00 21.02.2018 General

addendum 1
addendum 2

Download

R14-Kericho Torsogek-E221 Torit Ainamoi KeRRA/011/KCO/39/22%CRC/021/2017-2018 C 2,897,564.00 21.02.2018 Youth

addendum 1
addendum 2

Download

R7-Kericho E222 Kiptule-C25 Keben Belgut KeRRA/011/KCO/39/22%CRC/022/2017-2018 C 2,998,948.00 22.02.2018 General

addendum 1
addendum 2

Download

R7J1-Kericho C25 Keben-Koitalel Belgut KeRRA/011/KCO/39/22%CRC/023/2017-2018 C 1,999,376.00 22.02.2018 PWD’S

addendum 1
addendum 2

Download

U-G73020 C25 Kaptoboiti-Machorwa Belgut KeRRA/011/KCO/39/22%CRC/024/2017-2018 C 2,562,393.60 22.02.2018 General

addendum 1
addendum 2

Download

E222 Chebirirbei-D228 Chepnyogaa Belgut KeRRA/011/KCO/39/22%CRC/025/2017-2018 C 2,911,020.00 22.02.2018 General

addendum 1
addendum 2

Download

BoQ

U-G72997 D228 Kabianga-Rogonge Belgut KeRRA/011/KCO/39/22%CRC/026/2017-2018 C 2,966,120.00 22.02.2018 General

addendum 1
addendum 2

Download

R8-Kericho C23 Kapsuser-E222 Kipsolu Belgut KeRRA/011/KCO/39/22%CRC/027/2017-2018 C 3,457,960.00 22.02.2018 General

addendum 1
addendum 2

Download

BoQ

T2313-Buret B6 Chelilis junction- Getarwet junction Bureti KeRRA/011/KCO/39/22%CRC/028/2017-2018 C 2,499,278.00 22.02.2018 Youth

addendum 1
addendum 2

Download

RAR41- Buret Getarwet-Roret Bureti KeRRA/011/KCO/39/22%CRC/029/2017-2018 C 3,562,360.00 22.02.2018 General

addendum 1
addendum 2

Download

RAR56- Buret Cheborgei-Kipwastuiyo Bureti KeRRA/011/KCO/39/22%CRC/030/2017-2018 C 4,008,960.00 22.02.2018 General

addendum 1
addendum 2

Download

U-G712638 D226 Cheplanget-E187 Sosit Bureti KeRRA/011/KCO/39/22%CRC/031/2017-2018 C 2,903,044.42 22.02.2018 Women

addendum 1
addendum 2

Download

U-G712803 Kaplelach- Mosore Bureti KeRRA/011/KCO/39/22%CRC/032/2017-2018 C 3,008,344.00 22.02.2018 General

addendum 1
addendum 2

Download

E1090 Roret-D227 Bakoiyot Bureti KeRRA/011/KCO/39/22%CRC/033/2017-2018 C 3,000,224.00 22.02.2018 PWD’S

addendum 1
addendum 2

Download

E1091 D226 Mindililwet-DB Nyamira Sigowet/Soin KeRRA/011/KCO/39/22%CRC/034/2017-2018 C 3,004,052.00 21.02.2018 General

addendum 1
addendum 2

Download

URS12 Kapsorok- Ngendalel- Kebimbir- Kware-kileger Sigowet/Soin KeRRA/011/KCO/39/22%CRC/035/2017-2018 C 2,000,756.40 21.02.2018 General

addendum 1
addendum 2

Download

U-F7048 C25 Kiptere-Kapkochei Sigowet/Soin KeRRA/011/KCO/39/22%CRC/037/2017-2018 C 3,002,370.00 21.02.2018 General

addendum 1
addendum 2

Download

R14-Kericho B1 Kipsitet- Torsogek Sigowet/Soin KeRRA/011/KCO/39/22%CRC/038/2017-2018 C 5,305,144.00 21.02.2018 General

addendum 1
addendum 2

Download

 E236J1  Mau Thesalia-B1 Kipsitet Police  Sigowet/Soin  KeRRA/011/KCO/39/22%CRC/039/2017-2018 C  2,998,716.00  21.02.2018  PWD’S

addendum 1
addendum 2

Download

 E1100J1  D314 Tuiyobei- C35 Kipsirichet  Kipkelion East  KeRRA/011/KCO/39/22%CRC/040/2017-2018 C  1,992,067.84  19.02.2018  PWD’S

addendum 1
addendum 2

Download

E1100 B1 Chepseon complex-D314 Tuiyobei Kipkelion East KeRRA/011/KCO/39/22%CRC/041/2017-2018 C 2,122,828.00 19.02.2018 General

addendum 1
addendum 2

Download

U-G712788 E1100 J1 Tilolwet-C35 Kapkondoo Kipkelion East KeRRA/011/KCO/39/22%CRC/042/2017-2018 C 2,954,250.88 19.02.2018 Youth

addendum 1
addendum 2

Download

U-G712743 B1 Sitian-E1100 Junction Kipkelion East KeRRA/011/KCO/39/22%CRC/043/2017-2018 C 2,003,262.00 19.02.2018 General

addendum 1
addendum 2

Download

E266J1 B1 Sitian-D313 Kipyemit Kipkelion East KeRRA/011/KCO/39/22%CRC/044/2017-2018 C 1,199,498.00 19.02.2018 General

addendum 1
addendum 2

Download

D314 C35 Londiani-A104 Makutano Kipkelion East KeRRA/011/KCO/39/22%CRC/045/2017-2018 C 3,001,790.00 19.02.2018 General

addendum 1
addendum 2

Download

E254 Sorget Forest-A104 HillTop Kipkelion East KeRRA/011/KCO/39/22%CRC/046/2017-2018 C 3,860,127.36 19.02.2018 General

addendum 1
addendum 2

Download

U-G712766 D312 Kimalogit Bridge-Segetet Kipkelion West KeRRA/011/KCO/39/22%CRC/047/2017-2018 C 2,775,184.00 20.02.2018 Women

addendum 1
addendum 2

Download

 U-G712762  E251 Songonyet-Chepkechei-D312 Kebeneti  Kipkelion West  KeRRA/011/KCO/39/22%CRC/048/2017-2018 C 2,970,122.00 20.02.2018  Youth

addendum 1
addendum 2

Download

R66-Kericho D312 Kimasian-Tinga Farm Kipkelion West KeRRA/011/KCO/39/22%CRC/049/2017-2018 C 3,952,160.60 20.02.2018 General

addendum 1
addendum 2

Download

S1926-Nyando Koru-Chesigot-Singoiwek Kipkelion West KeRRA/011/KCO/39/22%CRC/050/2017-2018 C 2,978,996.00 20.02.2018 PWD’S

addendum 1
addendum 2

Download

URW5 Cherara factory- Mugut-Buratu-Kapkese Kipkelion West KeRRA/011/KCO/39/22%CRC/051/2017-2018 C 3,194,582.00 20.02.2018 General

addendum 1
addendum 2

Download

U-G712843 Kacheliba-Toroton-Magire Kipkelion West KeRRA/011/KCO/39/22%CRC/052/2017-2018 C 3,474,420.40 20.02.2018 General

addendum 1
addendum 2

Download

1)SCOPE OF WORKS 

The scope of works are as detailed in the Tender Document

  • The requirements for Bidding are as follows:

Tenderers shall include the following information and documents with their tenders, unless otherwise stated:

  1. copies of certificates of registration, and principal place of business;
  2. total monetary value of construction work performed for each of the last five years;
  3. experience in works of a similar nature and size for each of the last five years, and clients who may be contacted for further information on these contracts;
  4. major items of construction equipment owned and or signed lease agreement(s);
  5. qualifications and experience of key site management and technical personnel proposed for the Contract;
  6. reports on the financial standing of the Tenderer, such as profit and loss statements and auditor’s reports for the last five years;
  7. Authority to seek references from the Tenderer’s bankers.
  8. Registration with National Construction Authority for the applicable class valid at the date of tender of submission NCA 8 and Above
  9. Certificate of Incorporation
  10. VAT Registration Certificate
  11. Valid current Tax compliance certificate
  12. PIN registration certificate
  13. current litigation information

Tender documents may be obtained from KeRRA Website, www.kerra.go.ke, as from 22nd February, 2018

Completed bid documents, to be enclosed in a plain sealed envelope marked with the Tender name and number should be addressed to:

The Regional Manager

Kenya Rural Roads Authority

Kericho Region

P.O. Box 1483,

Kericho

and deposited in the tender box located at the KERRA OFFICES, KERICHO on or before 26th Feb, 2018 at 10.00 am. Tenders will be opened 10.05am. Contractors who wish to be present during tender opening can attend.

The Authority reserves the right to accept or reject any tender without giving reasons and is not bound to accept the lowest or any tender

Eng. M.Koech

REGIONAL MANAGER

Contact Us

Our Head Office

Kenya Rural Roads Authority,
Barabara Plaza, Block B
Airport South Road, Opp. KCAA
P.o. Box 48151-00100,
Nairobi. Kenya

Email: dg@kerra.go.ke 
Tel: 020-7807600 (01-05)
Mobile: +254 711 851103

**All email Communication to be channelled through the email dg@kerra.go.ke ** 

 

Copyright © 2026 Kenya Rural Roads Authority (KeRRA is ISO 9001:2008 Certified). All Rights Reserved.
Joomla! is Free Software released under the GNU General Public License.